What you priced vs what you're signing

This is the question Redline was built around: you priced the job, so are you signing the same job? GC paper routinely puts back the scope your proposal excluded and changes the terms you priced on. Redline reads your proposal next to the contract and shows every place they disagree, and what each one costs.

Live output

5 places this contract doesn't match what Copperline Flooring priced

portal / Review / Bid vs contract · Copperline Flooring proposal (fictional).pdfLive screen
  • high

    Unpriced Scope

    contract p. 1

    Your proposal excludes floor / substrate preparation ("Floor prep, grinding and leveling beyond minor patching", proposal p. 1), but the contract requires it ("…t tile and base work. 2.2 Subcontractor shall be responsible for all substrate preparation necessary to receive the flooring, including grin…", p. 1). Direct contradiction between your price and your contractual obligation. Exposure: Grinding, leveling, patching and related labor/material, commonly five figures on commercial slabs.

    Proposed language

    Notwithstanding any other provision, the following exclusion from Subcontractor's proposal is incorporated into and controls the Subcontract scope: "Floor prep, grinding and leveling beyond minor patching". Any such work, if required, shall be performed only pursuant to a written change order with an equitable adjustment to the Subcontract Price and Time.

  • high

    Unpriced Scope

    contract p. 1

    Your proposal excludes permits / fees ("Permits and permit fees", proposal p. 1), but the contract requires it ("…atching and leveling. 2.3 Subcontractor shall obtain and pay for all permits required for its Work.…", p. 1). Direct contradiction between your price and your contractual obligation. Exposure: Permit and inspection fees, plus schedule risk of procurement.

    Proposed language

    Notwithstanding any other provision, the following exclusion from Subcontractor's proposal is incorporated into and controls the Subcontract scope: "Permits and permit fees". Any such work, if required, shall be performed only pursuant to a written change order with an equitable adjustment to the Subcontract Price and Time.

  • high

    Labor / Acceleration

    contract p. 3

    Your proposal is priced on normal working hours ("normal business hours", proposal p. 1), but the contract allows required overtime, weekends, or added shifts ("…or shall accelerate its Work, including overtime and additional shifts, at no additional cost when directed by Contractor. ARTICLE 5. INDEMN…", p. 3). Premium labor is a direct hit to margin at time-and-a-half or worse.

    Proposed language

    Subcontractor's price is based on work performed during normal working hours, Monday through Friday. Overtime, weekend work, additional shifts, or acceleration directed by Contractor shall be compensable at Subcontractor's premium labor rates by change order.

  • high

    Price

    Your proposal total ($1,815,000, proposal p. 1) does not match the Subcontract Sum ($1,860,000), a difference of +$45,000. Confirm which number is right and WHY they differ (scope change? alternate accepted? typo?) before signing.

  • medium

    Payment Terms

    contract p. 2

    You quoted net-30 (proposal p. 1); the contract pays in 60 days (p. 2). That's 30 extra days of financing labor and material on every cycle, cash flow you didn't price.

    Proposed language

    Payment of Subcontractor's approved applications shall be made within 30 days of submission, consistent with the payment terms of Subcontractor's proposal.

The engine's own wording on the sample. Each one quotes the proposal line it rests on, so a misread is visible at a glance.

What it could cost

The contract's terms, in days and dollars

Days of delay that erase your profit

93 days

At $2,000/day in liquidated damages against ~$186,000 of profit (10% margin on $1,860,000), day 94 of delay puts this job underwater, and the LDs have no cap as written.

Your money held as retainage

$186,000

10% of the contract price held back until release conditions are met: this job's entire profit riding on release.

Owner-insolvency risk sits on you

Pay-if-paid

Payment is contingent on the owner paying the GC. If the owner doesn't pay, this clause says you don't get paid, no matter how good your work was.

You finance the work

60 days

You carry labor and material costs for up to 60 days per cycle on a $1,860,000 contract before payment lands, well past the net-30 you likely priced.

Arithmetic on the confirmed facts and the margin from the interview (10% here), nothing more. On the 101-page showcase contract the same comparison found 8 conflicts.

What gets compared

The scope and terms Redline checks your proposal against

Floor and substrate prepMoisture testing and mitigationHoisting, cranes and riggingCleanup and debrisTemporary power, water and heatPermits and inspection feesTesting, commissioning and mock-upsProtection of finished workFreight, taxes and escalationNumber of mobilizationsNormal hours vs overtimeDesign responsibilityThe price itselfPayment terms