Chapter 3. What you get back · Step 6 of 15

The findings

Each finding is a single decision, laid out the way a careful reviewer would hand it to you: what the contract says, the language Redline proposes instead, why it matters, where the flag came from, and how likely the GC is to take the change. Then you make the call.

Live screen

The findings list, exactly as it appears in a review

These are the portal's own finding cards, on the sample contract, in the order Redline would put them for this sub (their worries and must-changes first). Everything works: accept or reject a redline, set a management decision, or press Make it a rule.

Your calls carry forward: the sign-off gate in step 10 and the GC packet in step 11 use them.

  1. 1

    Struck and inserted language

    Red strike-through is the contract's words. Green is the replacement, written to drop into the document.
  2. 2

    Where the flag came from

    Construction law, the jurisdiction, your own standard, this contract, or the prime. Every recommendation is traceable.
  3. 3

    Will the GC take it

    Likely accepted, negotiable, or likely rejected, with the reason. Spend your leverage where it can win.
portal / Review / RedlinesLive screen

29 findings · 20 high · 0 decided

What flagged these

Construction law13Jurisdiction7Your standard3This contract5

Two different decisions

The words, and the risk

Accept or reject the redline

Works like tracked changes in Word: do you want this replacement language in what goes back to the GC? Rejected redlines stay out of the packet that goes to the GC.

Make the management decision

  • Accept the risk. Live with it, knowingly.
  • Negotiate. Push the redline with the GC.
  • Price it. Cover the risk in your number.
  • Insure it. Cover it with coverage.
  • Clarify first. Get it answered before signing.
  • Escalate to counsel. Send it to counsel.
  • Decline / walk-away. A walk-away issue.

Accepting, pricing or insuring a risk takes it off the GC ask, because you've handled it on your side.

Redline Construction Solutions

Redline construction contracts in minutes, not weeks. Reviewed against your standards and the construction-law context where you're building, in your own private cloud.