Redline Construction Solutions

Chapter 1. Get set up · Step 2 of 15

Upload the contract and your bid

The GC's subcontract arrives. You open the portal and give Redline up to three documents: the contract, your own proposal, and the prime contract if you have it. Only the first is required. Each one you add unlocks another layer of the review.

Two doors, one review

Start with the contract, or start with the form

Most people start with the contract: drop the PDF in and Redline reads it first, then asks only what the document couldn't answer. People who like to think through the job first can answer the intake form and upload at the end; Redline then shows where the contract disagrees with what they said.

Same engine, same protections, either way. Try the screen on the right: it is the one in the portal.

portal / New reviewLive screen

How do you want to start?

Two doors, one review: the same engine, the same protections, whichever way in fits how you work today.

Either way you can switch mid-flow, and both doors run the exact same review.

What goes in

Three documents, and what each one adds

The subcontract

Required

Harbor Point Medical Office: Subcontract (fictional).pdf

Every clause read against your standards, your rules, your insurance and the law where the project sits.

Your proposal or estimate

Recommended

Copperline Flooring proposal (fictional).pdf

The comparison that matters most: what you priced and excluded against what the contract makes you do. Without it, that layer stays silent rather than guess.

The prime contract

If you have it

Not attached in this sample

What the owner's contract flows down to you. If the subcontract incorporates a prime you weren't given, Redline flags it and drafts the request.

The sample

The job this walkthrough follows: Harbor Point Medical Office

  1. 1

    Copperline Flooring, Inc. is the sub

    A flooring contractor bidding resilient flooring, carpet tile and base, in Savannah, GA.
  2. 2

    Brookfield Ridge Builders, LLC is the GC

    Their subcontract says $1,860,000. The proposal said $1,815,000, with exclusions.
  3. 3

    Every party is fictional

    The contract is short so you can read all of it. The findings, facts and numbers in this walkthrough are the engine's real output on it. A full-size 101-page run is in the showcase.
uploads / Copperline Flooring proposal (fictional).pdfSimplified view
COPPERLINE FLOORING, INC.
PROPOSAL: Harbor Point Medical Office, resilient flooring and carpet tile

Base bid: $1,815,000
Payment terms: Net 30
One (1) mobilization included.
All work performed during normal business hours. No overtime included.

Exclusions:
Floor prep, grinding and leveling beyond minor patching
Permits and permit fees
Moisture mitigation
The proposal, as uploaded. Remember the exclusions: they come back in step 8.